Steel structures and bus ducts of Power Plants Masjed Soleiman dam
by: SPEEDES Group
This project consists of erecting four units of generator Busducts and the subsidiary equipments. |
|
|
Owner:
|
Iran Power Development Company (IPDC) |
Duration:
|
From Aug. 2000 for 12 months |
Employer:
|
Farab Company |
Consultant:
|
Moshanir Power Engineering Consultant |
|
Karoun-1 dam: The projects consists of erecting four units of generator bus ducts and the subsidiary equipment with an approx. weight of 930 tons, transferred from the lower part of the dam by two oblique shafts and narrow galleries and finally by vertical shaft with a height of 120 m to the top of the dam (take off yard) and to the rear of the transformers. The complex was commissioned after undergoing the necessary tests. Masjed Soleiman dam: This project include erecting and commissioning four bus duct of generator and the subsidiary weighing 200 tons including steel structure bus ducts, air pressurizing system, switch gear.
|
View Projects Images |