Montazer Ghaem Power Plant
 
by: SPEEDES Group

  Despite the fact that Constructive process of enlarging 230 KV post of Manzar Ghaem synthetic cycle power plant

Owner:

Iran Power Development Company (IPDC)

Duration:

4 Months From1988

Employer:

Iran Power Development Company (IPDC)
Consultant: Moshanir Power Engineering Consultant
Despite the fact that Constructive process of enlarging 230 KV post of Manzar Ghaem synthetic cycle power plant , in one hand accomplished in impossible way of Cutting off the electricity because of high consuming and in the other hand because of electrical loading of the next posts needs some especial surveillance , in this project all process such as :temporary and continual earth net ,delving , foundational fabrication and execution of network canal was completely done attentively and delicacy with ideal rate in the best way .