Jahrom Combined Cycle Power Plant (3 X 150 MW )
 
by: Speedes

  The power plant is located in Jahrom at south of Iran. Scope of work of contract consists of following ...

Owner:

Iran Power Development Company (IPDC)

Duration:

Closed On 28th December 2011(Due to employer financial situation)

Employer:

Management of Iran Power Plant Co.(MAPNA 2)

The power plant is located in Jahrom at south of Iran. Scope of work of contract consists of following structures:

-          3 units Turbine Hall including TG super structure and main equipments foundations, slab, wall and roof cladding.

-          6 units HRSG and stack foundations related to steam part

-          6 units Boiler feed pumps and 3 unit chemical dosing plant

-          3 units Fin fan coolers and main cooling tower foundations

-          Main and station and Auxiliary transformers foundations with fire wall

-          MV/LV switchgear buildings

-          Pipe and cable racks and trench

-          Evaporation pond

-          Water treatment and regeneration plant

-          Chemical process equipment and tanks foundations and civil requirement

-          Surface and oily and chemical and sewage drain water collection and treatment systems

-          Fire fighting and detection systems

-          HVAC system and central heating plant

-          Auxiliary system equipments and buildings

-          Auxiliary boilers equipment and building

-          Primary and secondary Earthing system

-          Lighting and lightening systems

-          Paging and telephone system

-          Condensate and make up water systems

-          Land scaping and earth works